Every case study below is work Innova has carried out, written from the job itself and illustrated with our own photographs. Each one sets out the access problem, the method we used, and what the client was left with.

Case studies

Facade restoration, roof works, gutters, repairs and high-level cleaning across London.

Clients are named where they have given permission. Everywhere else the building is described rather than identified, and nothing is claimed that the job itself does not support.

Two Innova rope access technicians suspended in the alley behind the rear elevation of The Baltic Exchange
Facade Restoration

38 St Mary Axe, City of London, EC3

Baltic Exchange Facade Restoration

Cement dust had bonded into the glazed tiles of the rear elevation. We lifted it on rope inside a live Mace site, then cleaned the windows and jet washed the paving ready for handover.

Read case study
Rope access technician drilling the rooflight kerb, drill tethered to the harness
Roof Repairs

Streatham, London, SW16

Velux Skylight Replacement

An ageing domed rooflight replaced with an opening Velux unit, fully sealed and weathered. Scaffold at the front, rope access at the rear, completed in a single day.

Read case study
Rope access technician cleaning the stone elevation of the ING office in the City of London
Facade Cleaning

City of London, EC2

ING Office Facade Cleaning

Glazing and stone reveals cleaned on a City frontage, worked from roof anchors so the pavement stayed open throughout.

Read case study
Technician soaping the entrance canopy glazing at the HALO building with the revolving door in use
Window Cleaning

London, E15

HALO Entrance Glass Cleaning

Canopy and entrance glazing cleaned from ropes above a revolving door that stayed in use throughout.

Read case study
Two rope access technicians cleaning the hotel tower elevation below the parapet signage
Facade Cleaning

London, E1

Hilton Garden Inn Facade Cleaning

Full-height glazing, panels and vertical fins cleaned on rope so nothing stood at the entrance of a working hotel.

Read case study
Three rope access technicians descending in parallel across a mirrored curtain wall elevation
Window Cleaning

London, E14

Glass Tower Window Cleaning

Three technicians rigged in parallel so adjacent drops were cleaned wet-on-wet and the finish stayed even across reflective glass.

Read case study
Rooftop parapet mid-clean, half still black with dirt and half washed back to white
Pressure Washing

London, SW1

Luxury Development Pressure Washing

Rooftop parapet, terraces and colonnade washed down top to bottom over successive days, working around a live BMU and a planted sedum roof.

Read case study
Technician suspended from the atrium beams working above an aluminium tower on the lobby floor
Specialist Cleaning

London, W1

Atrium Rooflight Cleaning

Glazed atrium rooflight and its steelwork cleaned over night shifts, using a mobile tower on the lobby floor and rope access from the roof structure above it.

Read case study
Looking down the rope line over the parapet coping to the internal courtyard below
Repointing

Central London, EC1

Roof Parapet Repointing

Eroded joints beneath a parapet coping raked out and repointed on rope, with the coping cleaned back and coated, inside a single working day.

Read case study
Rope access technician with a bucket working the concealed parapet gutter
Gutter Repairs

London, SW16

Parapet Gutter Repair

A hidden parapet gutter holding standing water cleared by hand on rope, dried with a torch and resealed over three visits.

Read case study
IRATA technician on ropes with harness and back-up device clearing the parapet gutter by shovel
Gutter Clearance

London, KT1

High Street Gutter Clearance

A guano-choked parapet gutter cleared on rope above a pedestrianised shopping street, with the shops and cafe terraces below open throughout.

Read case study
Torch-welding the lead seam beside the gutter outlet
Leak Repairs

London, W1

Lead Gutter Repair

A blocked lead-lined gutter cleared, the seam torch-welded at the outlet and the flashing joint sealed, worked off the scaffold already standing.

Read case study
Before: cracked, soot-blackened stucco cornice with anti-pigeon wires across the moulding
External Repairs

London, W2

Cornice Repair and Redecoration

A cracked, soot-blackened ornamental cornice cleaned down, filled, made good and redecorated in cream.

Read case study
Before: a long crack with dirt and lichen beside the window, moss at the downpipe mouth
External Repairs

London, N12

Render Crack Repair

A long crack beside a window repaired and made good in a matching textured finish, with the panel repainted and the downpipe head cleared.

Read case study
IRATA technician suspended in the lightwell with a mortar bucket on the harness, alongside the cast-iron downpipe
External Repairs

London, SW5

Lightwell Crack Repairs

Render cracks filled by hand on rope in a lightwell that would be slow to scaffold and would block the light to the windows facing into it.

Read case study
Technician working from the building's own BMU cradle, out over the roof edge
Cradle Access

London, E14

BMU Cradle Access

Work at high level taken from the building's own roof-mounted BMU cradle, with nothing set up on the pavement below.

Read case study
Rope access technician applying sealant by gun at the base of a brick chimney stack
Leak Repairs

London

Chimney Leak Repair

Sealing work at the base of a brick chimney stack, reached on rope across the slate pitch rather than from a scaffold or tower.

Read case study
Technician on the slate slope with replacement slates and a slate ripper beside him
Roof Repairs

London

Slate Roof Repair

Failed slates lifted and replaced in patches across a Victorian roof, working alongside the lead valley and parapet.

Read case study
Technician part way up the tiled slope on two ropes with a bucket clipped to the harness
Roof Repairs

London

Pitched Roof Tile Repairs

Repairs worked across a pitched tile roof on a two-rope system, with no scaffold and no roof ladder laid over the covering.

Read case study
Technician standing on the lead valley beside a tall Victorian chimney stack with eight clay pots
Roof Repairs

London

Victorian Chimney Stack Access

A tall multi-flue stack reached from the ridge on rope, with rope protection over the leadwork, for inspection and repair work out of reach of any ladder.

Read case study

Several case studies carry matched before and after photographs taken from the same position, so the result can be judged rather than described.

Access method is stated on every job: rope access, existing scaffold, mobile tower, cradle or ground level, chosen per elevation rather than sold as one answer.

Our repointing, sealing and render repairs are maintenance grade. Where a building needs lime work or stone repair, we provide the access and bring in a specialist mason.

Request a quote

Need a contractor who can show proof and still move quickly?